| Author |
Message |
|
| russm12 |
Posted: Fri Sep 07, 2007 11:01 pm |
|
|
|
Joined: 06 Sep 2007
Posts: 3
|
| I tried to enter scheduled vacation in Aug, 2008, but I was unable to block out the whole week. I needed to create a repeat entry, ending on the last day of vacation. It would be easier to have a ability to change end day to week later using calendar popup.[/b] |
|
|
| Back to top |
|
| abid |
Posted: Fri Sep 07, 2007 11:43 pm |
|
|
|
Joined: 28 Aug 2007
Posts: 378
|
| use repeat option in details section to stretch or shrink your days. |
|
|
| Back to top |
|
| Sabika |
Posted: Sat Sep 08, 2007 1:11 pm |
|
|
Joined: 02 Nov 2006
Posts: 699
|
|
| Back to top |
|
|
|